Home / Services / Geothermal

Geothermal Power

Around-the-clock clean heat and power, built on our group's drilling heritage. Of everything we do, this is the division where our origins matter most.

Resource
120–200°C brine
Depth
1–4 km
Capacity factor
90%+
Timeline
24–48 months

Why geothermal is different from everything else we build

Solar stops at night. Wind stops when the air is still. Geothermal does not stop. Production wells bring hot brine at 120 to 200°C up from a reservoir, a heat exchanger transfers that heat to an organic working fluid driving an ORC turbine, and the cooled brine returns underground through injection wells. A closed loop running at over 90% capacity factor, day and night.

For a grid operator, that is baseload. For an industrial user, it is process heat and power without intermittency. It solves a problem solar cannot.

What it requires

ComponentFunction
Drilling rig and well programmeRig, casing, cementing and wellheads — the same craft as oil and gas drilling
Downhole pumpsLine-shaft or electric submersible pumps lifting brine to surface
Heat exchangersTransfer brine heat to the organic working fluid without mixing
ORC turbine and generatorOrganic Rankine Cycle turbine generating from low-temperature heat
Cooling systemAir-cooled condensers, suited to desert sites with scarce water
Reinjection systemPumps and injection wells closing the loop and sustaining the reservoir

Exploration drilling is the make-or-break phase, and we say so upfront. The first wells confirm temperature and flow, and until they are drilled the resource is a model rather than a fact. Any developer telling you otherwise is selling optimism. Our advantage is that we drill those wells ourselves rather than subcontracting the riskiest part of the project.

Our position

Arabian Group of Companies has operated onshore drilling since 1988, working with national and international operators across the UAE and Oman, with IWCF-certified personnel and its own fleet. Geothermal is not an adjacent market we are entering — it is our original discipline applied to a different reservoir fluid.

Timeline

Resource assessment takes eight months, exploration drilling ten, production drilling twelve, power plant construction twelve, and commissioning six. A geothermal project runs 24 to 48 months, front-loaded with the highest-risk work.

Adjacent applications

Frequently asked questions

Why is geothermal valuable compared with solar?

It runs continuously at over 90% capacity factor, day and night, providing baseload power and process heat without intermittency. It solves a problem solar and wind cannot.

What is the biggest risk in a geothermal project?

Exploration drilling. The first wells confirm temperature and flow, and until they are drilled the resource is a model rather than a fact. It is the make-or-break phase of any geothermal development.

What drilling experience do you have?

Arabian Group of Companies has operated onshore drilling since 1988 across the UAE and Oman, with IWCF-certified personnel and its own rig fleet, working with national and international operators.

How long does a geothermal project take?

Typically 24 to 48 months, covering resource assessment, exploration drilling, production drilling, power plant construction and commissioning, with the highest-risk work front-loaded.

Start a project

Exploring geothermal?

Tell us the location and whether any subsurface data exists, and we will give you a realistic view of the resource risk before anything is committed.

Get an instant quotation Email our team

Related