Solar & Energy Transition EPC in the United Arab Emirates

We have been building solar in the UAE since 2005. Every emirate runs its own utility, its own application process and its own settlement rules, and we work across all of them.

Operating since
2005
Clean energy target
32% by 2030
Net zero
2050
Utilities covered
All five

The national picture

The UAE Energy Strategy 2050, updated in 2023, sets a target of 32% clean energy generation by 2030 and net zero across the energy and water sectors by 2050. It commits between AED 150 and 200 billion of investment by 2030 and aims to triple renewable capacity over that period. The UAE was the first country in the region to commit to net zero.

Underneath that national framework, each emirate operates independently. This is the single most important thing to understand about building solar here: there is no UAE-wide application process.

Which utility governs your project

EmirateUtilityProgramme
DubaiDEWAShams Dubai — net metering, credits carry forward
Abu DhabiADDCDoE self-supply framework, in effect since February 2026
Al Ain & Eastern RegionAADCDoE self-supply framework
SharjahSEWANet metering for approved installations
Ajman, RAK, Fujairah, UAQEtihadWEDistributed Solar System — credits expire annually

These differences are not cosmetic. DEWA credits carry forward indefinitely; EtihadWE credits expire at the end of the calendar year. That single distinction changes the optimal system size for an identical building in Dubai versus Ras Al Khaimah. A contractor who applies one emirate's assumptions to another will oversize or undersize the system.

Emirate by emirate

Utility-scale and beyond

The UAE hosts some of the largest and lowest-cost solar assets in the world. The Mohammed bin Rashid Al Maktoum Solar Park in Dubai continues to expand, with later phases pairing gigawatt-scale PV with very large battery storage, and Al Dhafra in Abu Dhabi operates at 2 GW on a single site.

Alongside solar EPC we develop battery storage, EV charging infrastructure, green hydrogen, carbon capture and geothermal. Our group's drilling heritage, dating to 1988, is what makes geothermal and CO2 storage a natural extension rather than a new departure.

Engineering standards

Our designs and performance calculations follow IEC 61215 and 61730 for module qualification, IEC 62109 for inverter safety, IEC 62933 for battery energy storage, NFPA 855 for storage fire safety, IEEE 1547 for grid interconnection and IEC 61724 for performance methodology. Final drawings are certified by licensed engineers and approved by the relevant authority during permitting.

Free tool: our UAE solar calculator sizes a system against your emirate’s actual credit rules — the only one that does.

See how your emirate compares: all five UAE utilities side by side.

Frequently asked questions

Is there a single solar approval process across the UAE?

No. Each emirate has its own utility and its own process. Dubai runs through DEWA's Shams Dubai programme, Abu Dhabi and Al Ain through ADDC and AADC under the Department of Energy framework, Sharjah through SEWA, and the northern emirates through EtihadWE's Distributed Solar System programme.

What is the UAE's clean energy target?

The UAE Energy Strategy 2050, updated in 2023, targets 32% clean energy generation by 2030 and net zero in the energy and water sectors by 2050, supported by AED 150 to 200 billion of investment by 2030.

Do solar credits work the same way in every emirate?

No. DEWA credits under Shams Dubai carry forward, while EtihadWE credits under the DSS programme are valid within the same calendar year only. This affects how a system should be sized for the same building in different emirates.

What size projects do you deliver?

From 5 kWp residential rooftops through to utility-scale plants of 20 to 200 MWp, and battery storage from 1 MWh commercial systems to 500 MWh grid-scale installations.

Are you approved to connect systems to the grid?

We are a DEWA-approved solar contractor and ISO 9001 certified, and have been delivering solar EPC in the UAE since 2005.

Start a project

Building in the UAE?

Tell us the emirate and the load, and we will handle the right utility process from survey through to energisation.

Get an instant quotation Email our team