Solar PV EPC
Engineering, procurement and construction for solar photovoltaic systems, from a single villa roof to a 200 MWp plant. Twenty years, one discipline, done properly.
- Range
- 5 kWp – 200 MWp
- Since
- 2005
- Certification
- ISO 9001 · DEWA
- Standards
- IEC 61215 / 61730 / 62109
What EPC actually means
Engineering, procurement and construction delivered as one contract with one party accountable. You are not managing a designer, a supplier and an installer separately and absorbing the gaps between them. We carry the design risk, the equipment risk and the construction risk.
That matters most when something goes wrong. If a module underperforms, there is no argument about whether it was specified badly, supplied wrongly or installed poorly, because all three were ours.
How a solar project runs
| Stage | What happens | Typical duration |
|---|---|---|
| Survey & feasibility | Roof or land assessment, structural check, shading analysis, consumption profiling, yield modelling | Week 1 |
| Design | Single line diagrams to IEC 60617, string layout, protection coordination, structural calculations | Weeks 1–3 |
| Permitting | Utility application, design approval, no-objection certificate | Weeks 2–6 |
| Procurement | Tier-one modules, inverters, mounting, cabling, protection — specified to the local approved list | Weeks 3–8 |
| Construction | Mounting, module installation, DC and AC works, earthing and lightning protection | Weeks 6–14 |
| Testing | Insulation resistance, polarity, IV-curve tracing, protection settings | Weeks 12–16 |
| Energisation | Utility inspection, metering, grid connection, handover with O&M plan | Weeks 14–18 |
Residential systems compress this to three to six weeks. Utility-scale plants of 20 to 200 MWp extend it to 10 to 18 months.
Where we build
- Rooftop — villas, warehouses, factories, labour accommodation, schools, mosques
- Car park canopies — generation plus vehicle shading, valuable in Gulf summers
- Ground mount — fixed tilt or single-axis tracking where land adjoins the load
- Utility scale — 20 to 200 MWp under national procurement frameworks
Engineering for desert conditions
Dust is the variable most often underestimated. Research in the UAE has measured substantial efficiency loss from soiling between cleaning cycles, and ambient temperature drives derating that a temperate-climate model will not predict. Three things follow, and we build them in as standard: module tilt and row spacing chosen for cleaning access rather than only for yield, string-level monitoring so soiling shows up before it becomes expensive, and an O&M schedule matched to the site's actual exposure.
Standards we design to
IEC 61215 and 61730 for module qualification and safety, IEC 62109 for inverter safety, IEC 60364 for electrical installations, IEEE 1547 for grid interconnection, IEC 60617 for drawing symbology, and IEC 61724 for performance methodology. Final drawings are certified by licensed engineers and approved by the relevant authority during permitting.
Free tool: our UAE solar calculator sizes a system against your emirate’s actual credit rules — the only one that does.
Frequently asked questions
What does solar EPC include?
Engineering, procurement and construction under a single contract: design, permitting, equipment supply, installation, testing, grid connection and handover. One party is accountable for all of it.
What size solar systems do you build?
From 5 kWp residential rooftops to 200 MWp utility-scale plants, plus commercial and industrial systems between those extremes.
How long does a solar project take?
A residential rooftop system takes three to six weeks. Commercial systems of 100 kWp to 5 MWp take two to four months. Utility-scale plants of 20 to 200 MWp take 10 to 18 months, including permits and grid approval.
Do you handle utility approvals?
Yes. Utility approval is part of the EPC scope. In Dubai that means DEWA design approval and inspection under Shams Dubai; each market we work in has its own process and we handle it.
Do you provide maintenance after commissioning?
Yes. We provide long-term O&M including cleaning schedules matched to site exposure, string-level performance monitoring and inverter servicing.
Start a project
Planning a solar project?
Describe the site and the load and our quotation engine returns a system design, bill of quantities and payback estimate immediately.